This is the keystone-cops fast-forward version of the journal, with links to the pages containing each step or operation. Click on the picture to reach the page.
1. Decide to do it, and get the stuff: Late February, 2001 | 2. Cut out the neck blank and make the scarf joint: March 4, 2001 |
3. Add heelblock, cut tenon, and insert truss rod: March 11, 2001 | 4. Attach headstock veneer: March 11, 2001 |
5. Make a workboard: March 11 | 6. Cut the peghead to shape: March 25 |
7. Carve the heel: March 25 | 8. Inlay the Rosette April 1 |
9. Inlay the Back Strip: April 1 | 10. Split the Brace Wood: April 1 |
11. Make Braces: April 8 | 12. Glue and Shape Braces: April 22 |
13. Install Threaded Inserts: April 22 | 14. Make Headblock: April 22 |
15. Make the Tailblock: April 29 | 16. Finish the Workboard: April 29 |
17. Bend the Sides: April 29 | 18. Assemble sides to soundboard: May 6 |
19. Shape the Back Arch: May 6 | 20. Brace the Back: May 6 |
21. Make the internal gluing cauls: May 6 | 22. Fit the back: May 6 |
23. Rope the back on: May 8 | 24. Fit end graft: May 12 |
25. Rout for binding on back: May 12 | 26: Glue binding on: May 12 |
27. Attach Neck: May 28 | 28. Attach Top Purfling: May 28 |
29. Binding Installed: June 3 | 30. Make and Install Fingerboard: June 3 |
<camera shy> | |
31. Carve Neck: June 10 | 32. Set Neck: June 10 |
33. Wash Coat: June 10 | 34. French Polish tools |
35. Attach Neck | 36. Carve Bridge |
36. Voila |
Copyright © 2001 Stephen Miklos